Zunft

Line 01 · ROI assurance for automation and AI

Zunft Proof

Before the CFO signs, find out whether the return is real.

Most automation business cases are built to be approved. They count the labour saved and leave out the ramp-up, the downtime, the scrap, the changeovers and the cost of people learning a new line. AI fails the same way: the pilot works, the real workflow doesn't, and the people who knew the exceptions have gone.

Zunft Proof re-underwrites the capital request before it is approved. We rebuild the return on our own math, name and size what threatens it, and set out the moves that raise the odds of hitting it. We never sell, install or manage what we assess, and we take no referral fees, so our call is worth trusting.

The plumb line: the mason's test that a wall is true before anything is built on it.

For

The CFO, CEO or board with an automation or AI capital request on the table, from a single robot line to an enterprise AI suite.

Why the business case breaks

The machine usually works. The system around it doesn't.

What the request countsLabour savedThe vendor's rateUptime at the rating on the plateBuilt to be approved.What it leaves out, and Zunft Proof puts backRamp-up and debuggingDowntime in the first yearScrap while the line settlesChangeoversPeople learning the new lineKnow-how that left with the people cut
Illustrative. Zunft Proof tests every item on both sides against what lines like yours actually did in their first year.

AI is automation. Every way a robot line underdelivers has an AI twin.

Where it breaksOn the robot lineIn the AI rollout
Demo against realityRuns at the integrator's site, struggles on your floorWorks in the pilot, never fits the real workflow
Hidden ramp-upDebugging, changeovers and scrap left out of the ROIData clean-up, integration and workflow redesign left out
Lost know-howExperienced operators cut; the line loses what they knewThe people who knew the exceptions leave; the agent can't handle them
TrustOperators work around the machinePeople ignore or rewrite the AI's output
DriftPLC logic stays stable for yearsModels drift as conditions change, so formed people matter more

What you receive

In writing, and yours to keep

01

The case, re-underwritten

Every assumption tested: ramp-up, downtime, scrap, changeovers and the people the plan takes for granted.

02

The return, rebuilt

What the investment will actually return on our math, with each risk named and sized in dollars.

03

Five to eight countermeasures

Specific moves in selection, formation, frontline leadership and tracking that raise the odds.

04

A clear call

Go, no-go, or go with conditions, and the conditions written down.

05

The twelve-month audit

Included. Twelve months on, the actual return reconciled against the promise, so the next request starts from evidence.

How it runs

Four steps. Each one says yes before the next begins.

01SuitabilityA live capital request,not yet approved.fits02Base dataThe request, the vendorproposal, line data.NDA signed03Site visitThe line walked; operators,maintainers, finance.data enough04ReportThe return rebuilt andthe call, in person.

If the screen says it does not fit, we tell you why and charge nothing. No data moves before an NDA. Every step leaves you with something in writing, so you can stop after any of them.

Terms

Pricing to follow · about two weeks from data to read-out

A fixed fee: half up front, half on completion. Travel billed at cost, from submitted expenses. We do not promise a return. We improve the odds and show our work.

Talk about a capital request